Well I understand how confusing it sounds, but wanted to create a cave under the land area. I have another idea where I could put plexi-glass under part of the egg crate and another sheet and angle it so that the drainage layer would drain down the side. :/ The problem with this is I can't just cover the drainage layer, but I need the bottom to look nice and to where the frogs won't crawl up in it. I know this sounds ridiculous so bear with me.





Reply With Quote
![United States [United States]](images/flags/United States.gif)

