April 28th. 2014 progress. Finished with all the foam applying, now comes the fun part of carving and painting. I built the rock wall background in three prefab sections rather than in the actual Vivarium itself. This allows me to place them any way I want for carving and painting and to test the water flow on the waterfall before I install it. The tree branches still need some foam work as well.
![]()