The foam coat arrived today. We applied the first (thin) coat tonight. This will need to dry for 24 hours before we can add the 2nd coat. I will get some pictures of it after it dries and can be touched again.
For anyone curious the foam coat was applied to the top and sides. That was allowed to dry for 4 hours and then it was layed on its back so the bottom could be coated. The foam coat was applied with a small stiff bristle brush. The first coat was a mixed a bit watery for the first coat to ensure it was able to get down into all the cracks and holes. The 2nd coat will be a bit thicker and allow us to build up the foam in sections where we think it needs it. The 2nd coat will also be tinted with Acrylic paint so we can ensure the 2nd coat covers everywhere. The 3rd coat will be colored the final base color of the formation. We will then apply acrylic highlights and then seal it with some sort of water proofer.... the water proofer is still being determined.