You want to have at least 1.5 inch covering the toad once they have burrowed down deep. I've got at least a 5 inch base now, but I'm going to add a few more inches. They LOVE to have multiple tunnels in their viv.
You want to have at least 1.5 inch covering the toad once they have burrowed down deep. I've got at least a 5 inch base now, but I'm going to add a few more inches. They LOVE to have multiple tunnels in their viv.
Rest in peace Rosie 5-31-12
Rest in peace Rufus 2-7-14
Rest in peace Morph 8-14-15
There are currently 1 users browsing this thread. (0 members and 1 guests)