Hi guys! Thanks for checking on me and the build.
Christmas for two very amazing little girls is over and I can start back on this project. No, I didn't build while on break for Christmas. Memories with the kids needed to be made. I am only one person so it takes a lot to make Christmas magic. I am much more dedicated to parenting then this project.I also had other personal issues to deal with that were not needed, but happened all the same.
Things are going, but as I have stated before living in small town America is a real pain sometimes. I wasn't able to buy everything that I needed and will have to make a trip to a better store before it is all said and done. (I will probably just order the rest online...but I need an excuse for big town retail therapy...) Ummm...let's see what else...OH! I already knew that I suck at drawing a straight line, well with the use of my father’s power tools I cut the pvc, and I also learned I can't cut in a straight line. So that gave me more work than it should have. But everything is planned out in my head and the majority of it is drawn onto paper/tank sides. Egg crate is cut and sitting in its place. The waterfall part is still playing out in my head and I am working on that today.
So question time...GE II Silicone has a mold/mildew inhibitor...I thought that this was unsafe for builds?





I also had other personal issues to deal with that were not needed, but happened all the same.
Reply With Quote
![United States [United States]](images/flags/United States.gif)




